Click on the category link

Construction metal structure stalls for storage and transport steam turbine rotors with CE certification
Construction and installation of galvanized steel structures
Construction and installation alluminum terraces  with isoftalic handrail for access to taken sampling on cooling towers
Construction and installation of metal structures roofing with COR-TEN sheet
Construction and installation of metal structures roofing with COR-TEN sheet
Construction and installation of galvanized steel structures
Construction oil sealing AP BP for 40 MW steam turbine
Machining cable reel for 80 mt coal unloader crane hoisting winch
Roughing hydroelectric alternator shaft by forged alloy steel
Complete revamping stator parts of 40 MW steam turbine
Turning 40 MW steam turbine rotor
Construction sealing collars for steam turbine with implants made of stainless steel AISI316
CNC turning of compressor bladed ring  diameter 1800 mm on vertical lathe
Machining of a full gear kit for steam turbine gas extraction gearbox
Construction and installation of galvanized steel structures
Machining ring gear for hoisting winch gearbox
CNC lathe mod. Zerbst with ECS CNC 4801, machining diameter 3500 mm x 12000 mm, max load 20 tons
Machining ring gear planetary gearbox LOHMANN for wind turbine
CNC turning lamination cylinder made of graphitic casted steel for railway rails mill
Boring milling machine mod. "FIL FCM 600" CNC ECS 2701, 7 controlled axes, stroke lengths 8000 x 2500 x 1100 mm, automatic bi-rotary head
Full recovery of gate valves for geothermal steam ANSI 600 and ANSI 3000
Construction and installation of storage and dosing system for sodium carbonate
CNC lathe mod. Potisje with FAGOR CNC 8050, machining diameter 1200 mm x 4000 mm
Realization of a new plant for superheated air adduction
Construction metal structure cyclone water separator for geothermal steam
Complete revamping stator parts of 60 MW steam turbine
CNC milling and drilling large metal structure crankcase
Full realization of a new facility for storage and dosing sulfuric acid
Realisation of settling tank discharge water stainless steel pipe
Construction and installation storage and dosing silos for cements
Construction stainless steel pressurized piping adapters for gas combustors with pressure test and CE certification
Company fleet (lifting and transport)
Construction, installation and maintenance industrial plants
CNC vertical lathe mod. SCHIESS retrofit with FAGOR 8050 CNC, machining diameter 3000 mm x 2000 mm, fifth controlled axe with boring / milling head
Boring milling machine "PAMA" CNC ECS 4801, translating rotary table
Construction of trasportable silencer ejector groups for geothermal steam
Complete replacement blades of steam turbine rotor
Complete construction of lifting beam for steel making plant crane capacity 160 tons
Complete replacement blades of steam turbine rotor